Team,
A lot was accomplished this week. The plumbers finished the water line rough in’s for the three bathrooms and the conference room. The boiler room chimney, which will no longer be used was insulated and closed off. The exterior vents and door vents were also insulated to keep out the cold air. More door security was added for the men’s room and the former sanctuary. The former sanctuary front wall is covered with tongue and groove wood, which did not extend to the floor as there were multiple levels leading up to the Alter. We couldn’t match the wood so we covered it with drywall as this area will be a storage room. We also patched the one sidewall with drywall where walls intersected. Lots of pieces had to be cut and trimmed to fit. We installed drywall in the Fellowship hall where the electrician will hang the new breaker box. We made a few dump runs carting off more debris. We spent time cleaning up the fellowship hall and organized it. Jane Hudgins stopped by to do a thorough job cleaning the warming kitchen and refrigerator. Organized the remaining snacks in plastic containers. Even cleaned the table tops and floor. Place looks great. We also had a visit from Tom and Wendy Crowe. Tom’s recovering from knee replacement surgery and physical therapy it is going well. Looking forward to seeing Tom return to the work site in the Spring. We met with a security system company to determine what we can do to protect the construction site now and what we will need in the future. Still working to obtain a roofing contract. You would think this would be easy! Thanks for your continued support. Steve Comments are closed.
|
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
July 2022
Categories |