Just another busy few weeks working at church. Things are really starting to come together.
The men’s room under floor drain pipes all need to be removed and capped off. So the floor was broken up and pipes cut off in preparation for the plumber to do his work. The remaining section of the chimney in the boiler room was knocked down and carted away. Lots of sledge hammer swinging and bending and lifting broken cinder blocks into our trucks to be hauled away. Many of the HVAC heaters / A/C units arrived on-site which is great to see. This was one of the most difficult contracts to be approved by the Architect simply because none of the initial equipment was available. Part 1 of the Pella windows arrived and we had lots of help to unloaded the very heavy windows. Also had a guest appearance by Ray Houck our lift gate operator! So glad to see the windows all lined up inside the church. Many of us spent time just sweeping and cleaning up the church. Construction just makes a lot of mess. Thanks to all of those who continue to support building our church. Thanks Steve Comments are closed.
|
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
May 2022
Categories |